The following photos are production progress photos of the Hampton Inn hotel under the Hilton Group project,Our production process includes the following steps:
1. Plate preparation: Prepare appropriate plates and accessories according to order requirements.
2. Cutting and cutting: Use professional cutting and cutting equipment to process the panels according to the design drawings.
3. Grinding and assembly: Grind the cut and cut boards, and then assemble them according to the design drawings.
4. Painting and decoration: Paint and decorate the furniture according to customer needs.
5. Quality inspection: After each step of production is completed, we will conduct strict quality inspections to ensure that the products meet customer requirements.
6. Progress monitoring: Throughout the entire production process, we will regularly monitor the progress to ensure on-time delivery. If we encounter any factors that may cause delay, we will communicate with the customer immediately and do everything possible to solve it.
Delivery and installation: Once the product is produced, we will arrange appropriate logistics methods to ensure that the product reaches the customer safely and on time. We then install it according to the customer’s specifications, ensuring that all furniture is placed in its proper location.
After-sales service: After delivery and installation, we will provide comprehensive after-sales service, including product maintenance, repair and replacement, etc. Our goal is to ensure that our customers are satisfied with both our products and services.
Post time: Dec-11-2023